> Ask a Question > Fix It Forum > subfloor
Login | Register


Posted by bc on May 7th, 2000 05:57 PM
In reply to Office Floor by Dave in Illinois on May 7th, 2000 05:32 PM [Go to top of thread]

3/4" tongue and groove is pretty much the standard subfloor that is glued down and screwed down with screws every 6" to 8".

You didn't ask but I have questions about the 4" drop and wonder if you shouldn't be concentrating on the foundation or whatever the problem is. Fix that and you've wasted a lot of time and material on the office floor. Post back with more specifics about the slope.

Was this post helpful? Yes: or No:

Topic History:

Topic Follow-ups:

About  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help

© 2016 Renovate Your World LLC