Posted by Joe on October 21st, 2002 03:40 PM
In reply to Pure speculation, but.... by Moderator, Steve on October 21st, 2002 03:00 PM [Go to top of thread]

One day was allowed between coats for each of the first 3 coats with screening of the finish between each coat. The 4th coat was applied 18 days after the 3rd coat and, of course, the finish was screened before the 4th coat was applied. The outside conditions during all of these coating operations was warm and humid.