> Ask a Question > Fix It Forum > New House Construction Under The Rain
Login | Register

New House Construction Under The Rain

Posted by grasshopper on February 28th, 2003 09:16 AM
In reply to New House Construction Under The Rain by Joe Nu House on February 27th, 2003 01:30 AM [Go to top of thread]

Watchout for high humidity after the doors and windows are installed. If the % RH is above 60% for extended time, mold will grow throughout. You need heavy duty dehumidification to reduce the %RH to about 50% through the construction phase. This is near impossible during the day with trades going in and out. You need 100 pints/day of dehumidification per 1,000 FT^ of space. But overnight good dehumidification will pull down to 50% and hold. Also before the trim and hardwood floors are nailed down, the home should be held for a week or two at 50% RH to shrink the water swollen frame and drywall. Also check basement or crawlspace for excess moisture. Most people don't catch this until to late. Stop doing the rain dance.

Was this post helpful? Yes: or No:

Topic History:

About  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help

© 2016 Renovate Your World LLC