Posted by David on March 7th, 2003 07:16 PM
In reply to WET OXBOARD SUB FLOOR by KAYE on March 7th, 2003 02:49 PM [Go to top of thread]

Kaye, I fully agree with Tom here, but out of said there was standing water on the subfloor 1-2 days before installing 3/8" oak flooring; does this mean that in just 2 days time the roof, insulation, drywall, etc. was all completed before installing the floor?

Was this post helpful? Yes: or No:

Topic History:

Topic Follow-ups: