Posted by tedlong2001 on June 6th, 2001 08:38 PM
In reply to cement driveway by George Wooster on April 3rd, 1998 06:53 PM [Go to top of thread]

I'm pouring a slab next to a old slab.The old slab is 20' by 24'. The new slab is 20'by24'. How often should I Dowel into the old slab on the 20' side, so both slab's raise and lower at the same time in cold weather. And should I put exspantion joints on the 20' side with the dowel's. We are using three eight dowel rod in the new slab each way every two feet.
PLease advise.
Thank you Ted