> Ask a Question > Fix It Forum > Bathroom Remodel
Login | Register

Bathroom Remodel

Posted by Dom A. on March 21st, 1998 10:51 AM
In reply to remodeling by Mike Logan on March 21st, 1998 09:01 AM [Go to top of thread]

Thanks Mike, I was hoping for a narrower range so here are some details: Gut completely, including removal of old mud/ceramic floor and ceiling. Remove existing window (do not replace). Rearrange fixture layout. Install new fixtures. Install new ceramic tile on floor and 4' up walls. Install ceramic tile in bath surround. Install light fixture and exhaust fan (separate). Install dry vent to roof (currently has old style wet vent system).

Was this post helpful? Yes: or No:

Topic History:

Topic Follow-ups:

About  | FAQ  | Contact  | Sitemap  | Privacy Policy  | Terms of Use  | Help

© 2016 Renovate Your World LLC